Story

On air. The free wire runs 15 minutes behind live. See pricing

World, crypto, finance and tech news, scored for impact.

CryptoTechFlowChinese, translatedFiled 26 h ago

SpaceX CEO Musk: Has ordered solar equipment with an annual capacity of 100 GW

Original headlineSpaceX CEO 马斯克:已订购年产能 100 GW 太阳能设备

Open the sourceReported by TechFlow, techflowpost.com, 10 November 2026

Not investment advice. Muhabbit scores how much a story may matter, not which way to trade.

SpaceX has placed an order with German equipment maker Singulus for heterojunction (HJT) solar cell production equipment with an annual capacity of 100 GW, to support its Starmind satellite project. The contract covers one turnkey HJT production line, with additional lines planned and first delivery expected in the first half of 2027, with capacity ramping toward the 100 GW equipment target. SpaceX is simultaneously accelerating Starmind satellite manufacturing in Bastrop, Texas. The deal signals large-scale vertical integration of solar cell supply for SpaceX's satellite ambitions and gives Singulus a major capacity commitment. Watch for further line orders and the pace of the Bastrop buildout ahead of the 2027 delivery.

Muhabbit's AI wrote this summary in its own words from TechFlow's report and translated it from Chinese. It can get details wrong, so check the source.

Named in this story

SpaceX (SPCX), Elon Musk, Singulus, Starmind, Bastrop, Texas

A linked name opens that asset's sentiment page.