Story

On air. The free wire runs 15 minutes behind live. See pricing

World, crypto, finance and tech news, scored for impact.

CryptoTokenPostKorean, translatedFiled 25 h ago

SpaceX 5GW outlook... power calculation for 10,000 units of equipment is up to 4GW

Original headline스페이스X 5GW 전망…장비 1만대 전력 계산은 최대 4GW

Open the sourceReported by TokenPost, tokenpost.kr, 10 November 2026, by 이도현

Not investment advice. Muhabbit scores how much a story may matter, not which way to trade.

GF Securities director Jeff Pu forecast in a November 10 X post that SpaceX will hold roughly 5GW of space-based AI compute capacity by 2028 using about 10,000 Kessel units, though the stated unit count multiplied by maximum per-unit power draw arithmetically yields only up to 4GW, short of the headline figure. Kessel is a space-grade compute unit carrying 72 of Nvidia's ($NVDA) Rubin GPUs, and Pu timed supply-chain volume ramp-up for the second half of 2027 through 2028. The forecast is Pu's estimate rather than SpaceX's official deployment record. The gap between the 5GW projection and the 4GW implied by the hardware math is the key discrepancy to watch, along with whether SpaceX confirms Kessel volumes and per-unit power specs as the 2027-2028 buildout window approaches.

Muhabbit's AI wrote this summary in its own words from TokenPost's report and translated it from Korean. It can get details wrong, so check the source.

Named in this story

SpaceX (SPCX), Jeff Pu, NVIDIA (NVDA), Kessel, GF Securities

A linked name opens that asset's sentiment page.