Story

On air. The free wire runs 15 minutes behind live. See pricing

World, crypto, finance and tech news, scored for impact.

BitcoinKoinbülteniTurkish, translatedFiled 19 h ago

Financing Changed at Bitcoin Miner MARA: $185 Million Bond for Energy Facility

Original headlineBitcoin Madencisi MARA’da Finansman Değişti: Enerji Tesisi İçin 185 Milyon Dolarlık Tahvil

Open the sourceReported by Koinbülteni, koinbulteni.com, 18 November 2026, by Selim Kuşçu

Not investment advice. Muhabbit scores how much a story may matter, not which way to trade.

MARA’s subsidiary priced a $185 million bond issuance to fund its acquisition of the Long Ridge energy facility in Ohio, according to a filing with the U.S. Securities and Exchange Commission. The move marks a shift in financing for the Bitcoin miner as it brings power generation in-house rather than relying solely on external energy contracts. Securing dedicated energy capacity matters for MARA because power costs and access are central to mining economics, particularly as hashprice pressure persists across the sector. The bonds are tied to the planned purchase of the facility, though the filing excerpt does not detail coupon or maturity terms. What to watch next is the closing of the Long Ridge acquisition and whether MARA expands this asset-backed financing approach for future infrastructure.

Muhabbit's AI wrote this summary in its own words from Koinbülteni's report and translated it from Turkish. It can get details wrong, so check the source.

Named in this story

MARA (MARA), Long Ridge energy facility, Ohio, SEC

A linked name opens that asset's sentiment page.